Strategies &amp; Effective Practices to Manage and Mitigate Hazards /taxonomy/term/118066/all en Equipment Identification - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/equipment-identification/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h3>Proper equipment tagging</h3> <ul> <li aria-setsize="-1" data-aria-level="2" data-aria-posinset="1" data-font="Arial" data-leveltext="•" data-listid="2" role="listitem"> <p paraeid="{9b4f7f6b-97de-4878-8689-2954d8a9c1b7}{141}" paraid="1909629463">Periodically complete a site survey to ensure that the Process and Instrumentation Diagram (P&amp;ID, also known as a flowsheet) accurately depicts plant equipment, valves and instruments as installed in the facility. </p></li></ul></div> </div> </div> Thu, 30 May 2019 17:18:40 +0000 cms_chrip 502981 at Excavation - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/excavation/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h2>Effective Practices to Manage and Mitigate Hazards</h2> <h5> </h5> <h3>Defer excavation to a future turnaround or outage</h3> <ul> <li>When the risk of excavation is considered unacceptable, consideration should be made to defer it until the plant is in a safer condition.</li> </ul> <h5> </h5> <h3>Identify all underground utilities and pipelines</h3> <ul> <li>All utilities and lines should be properly identified and appropriate parties notified before beginning any digging or clean-up work.</li> </ul> <h5> </h5> <h3>Prevent spoil falling back into excavation</h3> <ul></ul></div> </div> </div> Wed, 29 May 2019 16:15:08 +0000 cms_chrip 502486 at Scaffolding - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/scaffolding/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h2>Effective Practices to Manage and Mitigate Hazards</h2> <p></p></div> </div> </div> Fri, 24 May 2019 16:22:22 +0000 cms_chrip 502186 at Field Review of Permits - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/field-review-permits/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h3>Conducting initial field inspection</h3> <ul> <li>Ensure that the equipment that will be worked on is identified/tagged prior to issuing the SWP. </li> <li>Confirm that the location is safe and does not require additional measures to control hazards.  <ul> <li>Safe access is available for the work crew </li> <li>Area is safe to move objects required for execution of the job </li> <li>Escape routes are clear </li> </ul> </li></ul></div> </div> </div> Mon, 18 Mar 2019 13:58:58 +0000 cms_chrip 494406 at Equipment Filling and Mixing - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/equipment-filling-and-mixing/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h3>Hazard Identification</h3> <ul> <li>Identify chemicals that are incompatible if mixed.</li> <li>Identify places/opportunities when incompatible chemicals may be wrongly interacted and manage their confinements.</li> <li>Avoid using the incompatible chemicals, if possible, in the process as part of Inherently Safer Design. Use alternate compatible chemicals.</li> <li>Maintain chemicals and materials interaction matrix. </li> </ul> <h5> </h5> <h3>Human Factors – Design of 91³ÉÈ˶ÌÊÓÆµ Transfer Equipment</h3> <ul></ul></div> </div> </div> Mon, 11 Mar 2019 20:00:37 +0000 cms_chrip 493956 at Hot Tapping - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/hot-tapping/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h2>Site specific written down procedure for hot tapping</h2> <ul> <li aria-setsize="-1" data-aria-level="2" data-aria-posinset="1" data-font="Arial" data-leveltext="•" data-listid="2" role="listitem"> <p paraeid="{4b97fa3d-1955-421e-91b5-9e871dc7b5ed}{20}" paraid="793741057">Even though there are API codes and guidelines available for conducting welding/drilling on live systems, each facility is unique. It is recommended that each site develop an exhaustive procedure for carrying out hot tapping on live equipment at their premises.  </p></li></ul></div> </div> </div> Wed, 09 Jan 2019 20:30:23 +0000 cms_chrip 487046 at Confined Space Entry - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/confined-space-entry/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h2>Effective Practices to Manage and Mitigate Hazards</h2> <h5> </h5> <h3>Reduce risk by minimizing confined space entry work on vessels connected to equipment still in operation</h3> <ul> <li>Consider deferring confined space entry to a future turnaround or outage when inventories of hazardous materials are at a minimum or eliminated.</li> </ul> <h5> </h5> <h3>Properly isolate line or equipment to be worked on</h3> <ul> <li>Use blinds or physical disconnects.</li> <li>Do not use valves as isolation devices.</li></ul></div> </div> </div> Fri, 21 Sep 2018 21:04:58 +0000 cms_chrip 475766 at Line Opening - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/line-opening/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h2>Effective Practices to Manage and Mitigate Hazards</h2> <p></p> <h3>Reduce risk by minimizing work on lines connected to equipment still in operation</h3> <ul> <li>Consider deferring line breaking to a future turnaround or outage when inventories of hazardous materials are at a minimum or eliminated.</li> </ul> <p></p> <h3>Properly isolate line or equipment to be worked on</h3> <ul> <li> <p>Use of manual valves.</p> </li> <li> <p>Use of a double-block-and-bleed configuration to ensure manual valves are not leaking through.</p></li></ul></div> </div> </div> Wed, 21 Feb 2018 16:42:28 +0000 John Vasko 454886 at Energy Isolation - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/energy-isolation/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h2>Effective Practices to Manage and Mitigate Hazards</h2> <h5> </h5> <h3>Reduce risk by minimizing work on lines or equipment still connected to operating portion of the process unit</h3> <ul> <li>Consider deferring work activities requiring line or equipment opening to a future turnaround or outage when inventories of hazardous materials are at a minimum or eliminated.</li> <li>Consider deferring work activities on energized electrical circuits to a future turnaround or outage when these circuits can be properly de-energized.</li></ul></div> </div> </div> Wed, 21 Feb 2018 16:20:10 +0000 John Vasko 454831 at Temporary Instrumentation and Controls Bypass - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/bypassing-or-jumpering-instrumented-safeguards/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h3>Reduce risk by elimination of bypass events.</h3> <p>• Select safeguards that would not typically need bypassing for start-up.</p></div> </div> </div> Tue, 14 Nov 2017 18:49:14 +0000 John Vasko 445941 at Hot Work - Strategies & Effective Practices to Manage and Mitigate Hazards /ccps/resources/tools/safe-work-practices/hot-work/strategies-effective-practices-manage-and-mitigate-hazards <div class="field field-name-body field-type-text-with-summary field-label-hidden body-copy"> <div class="field-items"> <div class="field-item even"><h2>Effective Practices to Manage and Mitigate Hazards</h2> <h4>Reduce risk by elimination or substitution; move in-situ work to a less hazardous location</h4> <ul> <li>Fabrication and modification outside hazardous areas is prefera-ble with minimal hook up activities in situ.</li> <li>Consider deferring hot work to a future turnaround or outage when inventories of flammable materials is the plant at a mini-mum or totally eliminated.</li> <li>Move spark potential equipment such as air compressors outside hazardous areas and use long hoses.</li> </ul></div> </div> </div> Fri, 10 Nov 2017 17:12:54 +0000 John Vasko 445561 at